The 2012 excavation
In 2012, the group is again returning to the henge site at Stapleton’s Field. This year’s work is more ambitions than in the previous two seasons: the aim is to open a larger trench than before (40 m square) to be able to view an entire quadrant of the henge in plan. It is hoped that this will enable us to understand more about its form and development through time.
A Project Design has been prepared for the project and can be downloaded below. You will need Adobe Reader (free download) or similar software to read the file.
[1.67 Mb] K J Fitzpatrick-Matthews & S U O’Neill 2012 A Project Design for Stapleton’s Field Excavation 2012 & 2013.
Leave a comment
Comments 0